Filters
Question type

Study Flashcards

______________________________ is a costing approach where detailed costs to perform activities throughout the value chain are computed and can be managed or assigned to cost objects, including products.

Correct Answer

verifed

verified

activity-based costi...

View Answer

In the pull approach to manufacturing, the sales forecast drives the production plan and goods are produced in large batches.

A) True
B) False

Correct Answer

verifed

verified

Which of the following inventory frauds is not identified by Practice Alert No. 94-2: Auditing Inventories-Physical Observations?


A) double-counting inventory
B) counting obsolete inventory as salable
C) including inventory for which the corresponding payable has not been recorded
D) employee theft of inventory item having high sales volume

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

Trends in cost management/cost accounting include all of the following except:


A) reductions in the administrative costs of gathering data
B) a trend toward job order cost systems and away from process cost systems
C) adding a fourth cost category called direct technology
D) reduction in the direct labor cost component

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Supply chain management software provides ______________________________ to promise planning and ______________________________ to promise planning.

Correct Answer

verifed

verified

available,...

View Answer

A(n) ______________________________ is a group of similar workstations.

Correct Answer

verifed

verified

A(n) ______________________________ is a sequence of activities performed by an organization that add value or utility to the product produced or service rendered.

Correct Answer

verifed

verified

The material, labor, and machine requirements for each job are reflected in a manufacturing order.

A) True
B) False

Correct Answer

verifed

verified

Available to promise planning is the accumulation of data on current inventories, sales commitments, planned production and excess production capacity or other planned production capacity that could be quickly converted to production of the desired finished goods necessary to fulfill a sales order request.

A) True
B) False

Correct Answer

verifed

verified

An automated storage and retrieval system (AS/RS) is a computer-controlled machine that stores and retrieves parts and tools.

A) True
B) False

Correct Answer

verifed

verified

Manufacturing resource planning (MRP) is an integrated decision support system for planning, executing, and controlling manufacturing operations.

A) True
B) False

Correct Answer

verifed

verified

This shows when a manufacturing order or purchase order should be released so that the subassemblies and raw materials will be available when needed.


A) bill of materials
B) routing sheet
C) time-phased order requirements schedule
D) parts master file

E) A) and D)
F) C) and D)

Correct Answer

verifed

verified

A bill of material contains the standard material quantities that are required to produce one unit of end product.

A) True
B) False

Correct Answer

verifed

verified

With the pull approach to manufacturing, factory machinery is arranged in ______________________________.

Correct Answer

verifed

verified

______________________________ is an integrated decision support system for planning, executing, and controlling manufacturing operations.

Correct Answer

verifed

verified

Manufacturing resour...

View Answer

JIT is often called a kanban process.

A) True
B) False

Correct Answer

verifed

verified

The process of exploding the BOM results in a(n) ______________________________ requirements schedule.

Correct Answer

verifed

verified

______________________________ data marks the end of the conversion process and the movement of goods to the finished goods warehouse.

Correct Answer

verifed

verified

Showing 101 - 118 of 118

Related Exams

Show Answer