MRP systems seek to achieve which of the following?


A) Minimize lot sizes.
B) Determine the number of dependent demand items needed.
C) Relieve capacity bottlenecks.
D) Provide a yardstick for future improvements.
E) Improve on JIT methods.

F) B) and D)
G) C) and E)

Correct Answer

verifed

verified

MRP is based on dependent demand.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not a lot-sizing technique used in MRP systems?


A) Lot-for-lot (L4L)
B) Economic order quantity (EOQ)
C) Least total cost (LTC)
D) Least unit cost (LUC)
E) Warehouse loading factor (WLF)

F) All of the above
G) A) and D)

Correct Answer

verifed

verified

Which of the following is not a production activity report generated by MRP?


A) Exception report
B) Planning report
C) Performance control report
D) Planned-order schedules
E) Bill-of-materials report

F) A) and D)
G) B) and E)

Correct Answer

verifed

verified

A product tree can do which of the following?


A) Help to compute component usage.
B) Reduce product scrap.
C) Reduce labor overtime.
D) Reduce regular time labor.
E) Locate raw material supplies.

F) C) and E)
G) C) and D)

Correct Answer

verifed

verified

Which of the following is considered a primary report in an MRP system?


A) Planned-order schedule
B) Peg report
C) Planning report
D) Inventory accuracy report
E) Aggregate production plan report

F) A) and D)
G) A) and B)

Correct Answer

verifed

verified

In a net change MRP system, requirements and schedules are considered rigid and never updated.

A) True
B) False

Correct Answer

verifed

verified

This industry type combines multiple component parts into a finished product, which is then stocked in inventory to satisfy customer demand.


A) Assemble-to-stock
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order

F) A) and D)
G) B) and D)

Correct Answer

verifed

verified

The three main inputs to an MRP system are the bill-of-materials, the master schedule, and the inventory records file.

A) True
B) False

Correct Answer

verifed

verified

The master production schedule deals exclusively with dependent demand items.

A) True
B) False

Correct Answer

verifed

verified

MRP provides the schedule specifying when each part and component of an end item should be ordered or produced.

A) True
B) False

Correct Answer

verifed

verified

A modular bill-of-materials includes items with fractional options.

A) True
B) False

Correct Answer

verifed

verified

The least unit cost method of lot-sizing adds ordering, stock-out, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is an input to the master production schedule?


A) Prototype products from product development
B) Aggregate component schedule
C) Peg reports
D) Exception reports
E) Forecasts of random demand from customers

F) None of the above
G) B) and C)

Correct Answer

verifed

verified

MRP is least valuable in industries where a number of products are made in batches using the same productive equipment.

A) True
B) False

Correct Answer

verifed

verified

In an MRP problem, A is an MPS item. Every A requires 2 B's and 3 C's. Every B requires 5 C's. All lead times are two periods. All initial inventory values are 0. Use lot-4-lot method for order quantities for all items. What is the low level code (LLC) for B and C?


A) LLC for B is 2 and C is 1.
B) LLC for both B and C is 2.
C) LLC for B is 1 and C is 2.
D) LLC for B is 0 and C is 1.
E) LLC for all items is 1.

F) C) and E)
G) None of the above

Correct Answer

verifed

verified

Which of the following is the net requirement using an MRP program if the gross requirement is 1,000 and the inventory on hand is 500?


A) 1,000
B) 950
C) 500
D) 400
E) 350

F) A) and C)
G) None of the above

Correct Answer

verifed

verified

In this industry type, items are manufactured by machine to customer order. These are generally industrial orders.


A) Process
B) Make-to-stock
C) Assemble-to-order
D) Make-to-order
E) Engineer-to-order

F) All of the above
G) A) and B)

Correct Answer

verifed

verified

A BOM file is also called which of the following?


A) Product tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule

F) D) and E)
G) A) and C)

Correct Answer

verifed

verified

Which of the following industry types have high expected benefits from the application of MRP?


A) Fabricate-to-order
B) Hospitals
C) Assemble-to-order
D) Aircraft manufacturers
E) Oil refineries

F) B) and E)
G) C) and D)

Correct Answer

verifed

verified