Effective use of MRP and other dependent demand models does not require which of the following?


A) master production schedule
B) bill of materials
C) inventory availability
D) lead times
E) cost of individual components

F) A) and B)
G) D) and E)

Correct Answer

verifed

verified

MRP is an excellent tool for scheduling products with variable lead times.

A) True
B) False

Correct Answer

verifed

verified

__________ is a lot-sizing technique that generates exactly what is required to meet the plan.

Correct Answer

verifed

verified

Finite capacity scheduling, unlike MRP, recognizes the capacity limitations of departments and machines when building schedules.

A) True
B) False

Correct Answer

verifed

verified

Which of the following statements regarding MRP in services is true?


A) MRP is for manufacturing only, and is not applicable to services.
B) MRP can be used in services, but only those that offer very limited customization.
C) MRP does not work in services because there is no dependent demand.
D) Services such as restaurant meals illustrate dependent demand, and require product structure trees, bills-of-material, and scheduling.
E) None of the above is true.

F) C) and D)
G) A) and C)

Correct Answer

verifed

verified

The extension of MRP which extends to resources such as labor hours and machine hours, as well as to order entry, purchasing, and direct interface with customers and suppliers is


A) MRP II
B) enterprise resource planning
C) the master production schedule
D) closed-loop MRP
E) not yet technically possible

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

The time-phased product structure, unlike the bill of material, adds the concept of lead times.

A) True
B) False

Correct Answer

verifed

verified

Consider the bill of material for Product J and the data given in the following table. The gross requirements for J are 200 units in week 6 and 250 units in week 8. Develop the MRP tables for each item for an 8-week planning period. Use the lot-for-lot lot-sizing rule. Consider the bill of material for Product J and the data given in the following table. The gross requirements for J are 200 units in week 6 and 250 units in week 8. Develop the MRP tables for each item for an 8-week planning period. Use the lot-for-lot lot-sizing rule.    Consider the bill of material for Product J and the data given in the following table. The gross requirements for J are 200 units in week 6 and 250 units in week 8. Develop the MRP tables for each item for an 8-week planning period. Use the lot-for-lot lot-sizing rule.

Correct Answer

verifed

verified

Closed-loop MRP systems allow production planners to move work between time periods to smooth the load or to at least bring it within capacity.

A) True
B) False

Correct Answer

verifed

verified

__________ is a system that allows, with MRP in place, inventory data to be augmented by other resource variables.

Correct Answer

verifed

verified

Material requirement...

View Answer

A(n) __________ system is packaged business software that automates and integrates the majority of their business processes, shares common data and practices across the entire enterprise, and produces and accesses information in a real-time environment.

Correct Answer

verifed

verified

enterprise...

View Answer

A(n) __________ can illustrate whether a work center has been scheduled beyond its capacity.

Correct Answer

verifed

verified

load repor...

View Answer

In continuous (stock-to-forecast) operations, the master production schedule is usually expressed in terms of


A) end items
B) modules
C) kits
D) customer orders
E) warehouse orders

F) C) and D)
G) A) and D)

Correct Answer

verifed

verified

Enterprise resource planning (ERP)


A) seldom requires software upgrade or enhancement
B) does not integrate well with functional areas other than operations
C) is inexpensive to implement
D) automates and integrates the majority of business processes
E) all of the above

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

An error has been detected in the technical drawing of a product about to be placed on a master production schedule. The part should be 9" by 12", not 9 cm by 12 cm; further, the part should be stainless steel, not ordinary steel. What document transmits the needed change? Where is the corrected information recorded? Why is this important to the master production schedule?

Correct Answer

verifed

verified

An engineering change notice or ECN is t...

View Answer

How does the process choice of an organization affect the basis of its master production schedule?

Correct Answer

verifed

verified

In a continuous focus (make-to-stock) co...

View Answer

A bill of material lists all components, ingredients, and materials needed to produce one unit of an end item.

A) True
B) False

Correct Answer

verifed

verified

__________ are a way of allowing a segment of the master schedule to be designated as "not to be rescheduled."

Correct Answer

verifed

verified

Which of the following statements regarding lot-sizing is true?


A) EOQ principles should be followed whenever economical.
B) Too much concern with lot-sizing results in false accuracy.
C) Lot-for-lot cannot be modified for scrap allowance or process constraints.
D) The Wagner-Whitin algorithm simplifies lot size calculations.
E) All of the above are true.

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

Each R requires 4 of component S; each S requires 3 of part T. The lead time for assembly of R is 1 week. The lead time for the manufacture of S is 2 weeks. The lead time for the procurement of T is 6 weeks. The cumulative lead time for R is __________ weeks.


A) 6
B) 9
C) 12
D) 18
E) 28

F) C) and E)
G) B) and E)

Correct Answer

verifed

verified